Bathroom Remodeling in Virginia Gardens
From a tub-to-shower conversion to a full gut, the part that matters is the part you will never see: the waterproofing and the rough plumbing behind the tile.
Bathroom work in Virginia Gardens
Virginia Gardens is a small village beside Miami International Airport with 1940s–1950s single-family homes, so remodels often add sound-dampening impact windows and update original kitchens and baths in houses that have seen few changes in decades.
Plumbing and building permits pulled by PSR. Unincorporated Miami-Dade (Kendall included) permits through the county’s RER Building division, while incorporated cities such as Miami, Miami Beach, Coral Gables and Hialeah run their own building departments — all enforcing the Florida Building Code’s High-Velocity Hurricane Zone provisions.
Bathrooms fail from the inside out. A beautiful tile job over a bad pan or an unvented drain is a leak in two years and a mold claim in five. We build the wet area to the manufacturer's waterproofing spec, have it inspected, and only then tile.
What's in the scope
- Tub-to-shower conversions with curbless or low-curb entries, linear drains, and glass.
- Full gut remodels: new layout, relocated drains and supply, new vanity, toilet, lighting and ventilation.
- Tile and stone on floors, walls and niches, with a sealed, sloped shower pan under it.
- Accessibility: grab-bar blocking, wider doors, comfort-height fixtures, no-threshold showers.
The permit
Moving a drain or adding a circuit needs a plumbing and electrical permit in every South Florida jurisdiction. We file it, meet the inspector for the rough-in and the final, and close it out. In a condo, we also handle the association's contractor paperwork and insurance certificate.
PSR-002 · demo · plumbing · tile · fixtures · install

How a bathroom job runs in Virginia Gardens
The permit is ours to pull, not yours to chase. Every job runs through the same six steps, and you can see which one you are on.
- 1Permit applicationPlans, documents and fees submitted to your city or county.
- 2Plan reviewReviewer comments answered and corrections filed by us.
- 3InspectionsRough plumbing, electrical, framing — we schedule and meet every one.
- 4ApprovalsAll trades signed off before anything gets closed up.
- 5Final walkthroughQuality check and punch list with you, room by room.
- 6Final inspectionPermit closed and the certificate issued.
Questions we get asked
How long does a bathroom remodel take?
Two to three weeks for a conversion or refresh; four to six for a full gut with plumbing moves, plus the city's permit review time.
Do you handle condo association approvals?
Yes. We supply the certificate of insurance, licence copy, scope letter and schedule the association typically asks for, and we follow the building's work-hour rules.
More in Virginia Gardens
Ready to price bathroom work in Virginia Gardens?
Call now or request a free in-home estimate. We answer the phone.