Bathroom Remodeling

Bathroom remodeling, waterproofed and inspected

From a tub-to-shower conversion to a full gut, the part that matters is the part you will never see: the waterproofing and the rough plumbing behind the tile.

Get a free estimate

Licensed & insured
Permits pulled for you
Broward, Miami-Dade & Palm Beach
Free in-home estimate
One crew, inside and out
Every inspection scheduled and met by us
Written scope with the permit work itemised
Kitchens, baths, roofs, patios, pavers — eight trades

Bathrooms fail from the inside out. A beautiful tile job over a bad pan or an unvented drain is a leak in two years and a mold claim in five. We build the wet area to the manufacturer's waterproofing spec, have it inspected, and only then tile.

What's in the scope

  • Tub-to-shower conversions with curbless or low-curb entries, linear drains, and glass.
  • Full gut remodels: new layout, relocated drains and supply, new vanity, toilet, lighting and ventilation.
  • Tile and stone on floors, walls and niches, with a sealed, sloped shower pan under it.
  • Accessibility: grab-bar blocking, wider doors, comfort-height fixtures, no-threshold showers.

The permit

Moving a drain or adding a circuit needs a plumbing and electrical permit in every South Florida jurisdiction. We file it, meet the inspector for the rough-in and the final, and close it out. In a condo, we also handle the association's contractor paperwork and insurance certificate.

PSR-002 · demo · plumbing · tile · fixtures · install · Plumbing and building permits pulled by PSR

PSR tile setter placing large-format porcelain on a shower wall with levelling clips

How a bathroom job runs

Same six steps as every PSR job. Plumbing and building permits pulled by PSR.

  1. 1Permit applicationPlans, documents and fees submitted to your city or county.
  2. 2Plan reviewReviewer comments answered and corrections filed by us.
  3. 3InspectionsRough plumbing, electrical, framing — we schedule and meet every one.
  4. 4ApprovalsAll trades signed off before anything gets closed up.
  5. 5Final walkthroughQuality check and punch list with you, room by room.
  6. 6Final inspectionPermit closed and the certificate issued.

Questions we get asked

How long does a bathroom remodel take?

Two to three weeks for a conversion or refresh; four to six for a full gut with plumbing moves, plus the city's permit review time.

Do you handle condo association approvals?

Yes. We supply the certificate of insurance, licence copy, scope letter and schedule the association typically asks for, and we follow the building's work-hour rules.

What homeowners say

Real Google reviews from PSR Home Remodeling customers across South Florida.

4.9 ★★★★★
87 Google reviews
  • ★★★★★

    “I had a wonderful experience with PSR Home Remodeling! From start to finish, the team was professional, reliable, responsive, and truly cared about the quality of their work. …”

    M Moran B.
    Whole-home remodel · Sep 2026
  • ★★★★★

    “Love my new bathroom! From A-Z everything was excellent and in time. The crew did very precise tile work, and they provided me help choosing materials.”

    A Alexandra Z.
    Bathroom · Apr 2026
  • ★★★★★

    “PSR Home Remodeling did my backyard deck, couldn't be happier with the quality, clear pricing. thank you so much ! amazing service”

    K Karla B.
    Deck · Mar 2026

Read all 87 reviews on Google →

Ready to price your bathroom project?

Call now or request a free in-home estimate. We answer the phone.