Interior Paint

Interior Paint in Miami Shores

Two coats of good paint over unrepaired drywall is still a bad paint job. We patch, sand, prime and then paint, and we say which paint and how many coats on the estimate.

Get a free estimate

Licensed & insured
Permits pulled for you
Broward, Miami-Dade & Palm Beach
Free in-home estimate
One crew, inside and out
Every inspection scheduled and met by us
Written scope with the permit work itemised
Kitchens, baths, roofs, patios, pavers — eight trades

Paint work in Miami Shores

Miami Shores Village enforces some of the strictest appearance rules in the county, with a Planning and Zoning Board that reviews exterior changes on its 1920s–1950s homes, so paint, fencing and roofing choices are checked before a permit issues.

No permit required — included in any permitted remodel. Unincorporated Miami-Dade (Kendall included) permits through the county’s RER Building division, while incorporated cities such as Miami, Miami Beach, Coral Gables and Hialeah run their own building departments — all enforcing the Florida Building Code’s High-Velocity Hurricane Zone provisions.

Interior paint is the last trade in every remodel we do, so our painters work to the same standard as the tile and cabinet crews: protected floors, cut lines you cannot see, and a room you can move back into the next day.

What's in the scope

  • Prep: nail pops, cracks, popcorn-ceiling removal, old wallpaper, water stains sealed.
  • Prime and two finish coats in a washable finish for Florida humidity: eggshell on walls, semi-gloss on trim and doors.
  • Trim, doors, ceilings and closets quoted separately so you can see what you are paying for.

PSR-004 · prep · prime · paint · trim

PSR painter cutting in a clean line along crown moulding

How a paint job runs in Miami Shores

The permit is ours to pull, not yours to chase. Every job runs through the same six steps, and you can see which one you are on.

  1. 1Permit applicationPlans, documents and fees submitted to your city or county.
  2. 2Plan reviewReviewer comments answered and corrections filed by us.
  3. 3InspectionsRough plumbing, electrical, framing — we schedule and meet every one.
  4. 4ApprovalsAll trades signed off before anything gets closed up.
  5. 5Final walkthroughQuality check and punch list with you, room by room.
  6. 6Final inspectionPermit closed and the certificate issued.

Questions we get asked

How long does painting a 3-bedroom house take?

Three to five working days for walls, ceilings and trim with normal prep. Popcorn-ceiling removal adds a day or two per room.

Which paint do you use?

Sherwin-Williams or Benjamin Moore interior lines by default. If you have a preferred product or colour deck, we use it.

Ready to price paint work in Miami Shores?

Call now or request a free in-home estimate. We answer the phone.